biz@arfont.pro Phone / WhatsApp: +86 137 1272 8166
USPTO Reg. No. 7,389,548
Facility, Quality & Global Fulfillment

In-House Manufacturing Facility & Metrology QC Laboratory

5,000+ m² production campus in Humen, Dongguan combining 50+ multi-axis CNC centers, automated anodizing tanks, and strict ISO 9001-aligned quality control workflows under ISO 2768-mH tolerances.

In-House Production Equipment

High-Speed CNC Milling Centers (35 Units): 3-axis, 4-axis, and 5-axis CNC machines (spindle speeds up to 20,000 RPM) machining aluminum, copper, stainless steel, and engineering plastics.
Precision CNC Turning Centers (15 Units): Live-tooling CNC lathes enabling integrated turning, cross-drilling, and tapping in a single setup.
Automated Extrusion Cutting & Tapping: High-precision automatic profile saws (±0.05 mm length tolerance) and dedicated multi-spindle tapping stations.
Integrated Automated Anodizing Line: In-house anodizing tanks (clear, black, color, hard anodizing), bead-blasting cabinets, and satin wire-drawing units for uniform film thickness.
Factory Floor Production Tour (Humen, Dongguan) HD MP4
Automated CNC machining line inside ARfont facility Precision CNC machining cells
Metrology & Reliability Verification

Quality Control Laboratory & Technical Standards

Every order passes four documented gates: Raw Material Inspection → In-Process QC (IPQC) → 100% Metrology Verification → Salt Spray & Adhesion Validation. Our internal production operates on an ISO 9001-aligned quality workflow, complemented by ISO 9001:2015-certified strategic manufacturing partners for specialized assemblies.

Precision metrology instruments and dimensional gauges

3D CMM & Dimensional Gauging

Full 3D Coordinate Measuring Machine verification, Mitutoyo digital height gauges, and calibrated M3–M8 Go/No-Go thread gauges.

SMV-3020 2D optical video measurement system

2D Optical Video Measurement (SMV-3020)

High-magnification optical inspection for micro-dimensions, hole center pitch accuracy, and fin/profile geometry.

Pull-out force and coating hardness testing laboratory bench

Salt Spray (24h–120h+) & Force Testing

In-house Neutral Salt Spray (NSS) corrosion chamber, coating thickness & cross-hatch adhesion tests, and >10 KGF copper-pin pull-out validation.

ISO 2768-mHMachining Tolerances
ISO 9001-AlignedQuality Workflow
EU RoHS 2.0100% Material Compliance
24h – 120h+Neutral Salt Spray (NSS)
Global B2B Fulfillment

5-Step OEM/ODM Workflow & International Trade Terms

STEP 01

Submit Drawings

Send 3D CAD (STEP, IGES, X_T) & 2D PDF/DWG with tolerances and quantities to biz@arfont.pro.

STEP 02

24h DFM & Quote

Engineering DFM check on wall thickness, tool access, and tolerance stack-up with formal quotation.

STEP 03

3–5 Day Prototype

Rapid CNC sampling with First Article Inspection (FAI) report shipped via DHL/FedEx/UPS.

STEP 04

Volume Production

Scaled multi-axis CNC, extrusion, and automated anodizing with real-time IPQC monitoring (12–18 days).

STEP 05

100% QC & Export

Final CMM/adhesion checks, anti-scratch EPE export packaging, and door-to-door global delivery.

Supported Incoterms & Lead Times

  • FOB Shenzhen / Guangzhou: Standard ocean & containerized freight delivery.
  • EXW Dongguan: Direct factory pickup for customer-designated forwarders.
  • CIF / CFR & DDP / DAP: Door-to-door air express (DHL, FedEx, UPS) or sea freight with customs clearance.
  • Lead Times: 3–5 business days for rapid prototypes; 12–18 business days for standard mass production.

Export Packaging & Payment Terms

  • Internal Protection: Individual bubble bags, soft pearl cotton (EPE) sleeves, or anti-scratch blister trays for anodized visual surfaces.
  • External & Palletization: Double-wall 5-ply export cartons + ISPM 15 heat-treated fumigation-free wooden pallets or plywood crates.
  • Wire Transfer (T/T): 30% deposit upon PO issuance, 70% balance prior to shipment.
  • Samples & Small Batches: PayPal, Western Union, or credit card for expedited release.